GM Egypt Factory

GM Egypt Factory


Project Description

Project name: Alternative Study & evaluation For Firefighting System

Project Location: GM Egypt Factory 6th October – Industrial Zone

Scope of work : Technical study and evaluation for firefighting requirements from GM Egypt in order to increase the capacity of the firefighting water reserve including comparison between two proposals for location and capacities needed .

Project name: Steel Structure

Project Location: GM Egypt Factory 6th October – Industrial Zone

Scope of work : Design & Supervision

Project name: Fire Fighting  3000 m3 Tank

Project Location: GM Egypt Factory 6th October – Industrial Zone – Egypt

Scope of work : Design & Supervision for the Architectural, Structural and Electro mechanicals systems for the new Firefighting tank with capacity 3000 m3  & Pump Room.

Project name: GM Fuel Fill Area

Project Location: GM Egypt Factory 6th October – Industrial Zone

Scope of work : Design & Supervision for the Architectural, Structural and Electro mechanicals systems for the new Fuel Fill Area located inside the factory, in addition to evaluation of the old FF/FA existing systems.



Project Details
  • Client:

    GM Egypt

  • Location:

    6th October – Industrial Zone